Cruise Industry News
Staff Captain
Cruise Industry News Has Just Posted the Following:
<p><img style="margin: 5px; float: left;" src="http://www.cruiseindustrynews.com/images/stories/wire/2015/june/magellen.jpg" height="134" width="200" />The 46,052-ton Magellan has recently completed a five-week scheduled maintenance drydock at Damen Shiprepair Amsterdam. For two of the weeks the 222-metre vessel was positioned in the yard’s 250-meter no.4 dry dock where the hull, rudders and propellers underwent a thorough inspection and cleaning.</p>
<p>Originally built for Carnival Cruise Lines in 1985
Click here to view the article.
<p><img style="margin: 5px; float: left;" src="http://www.cruiseindustrynews.com/images/stories/wire/2015/june/magellen.jpg" height="134" width="200" />The 46,052-ton Magellan has recently completed a five-week scheduled maintenance drydock at Damen Shiprepair Amsterdam. For two of the weeks the 222-metre vessel was positioned in the yard’s 250-meter no.4 dry dock where the hull, rudders and propellers underwent a thorough inspection and cleaning.</p>
<p>Originally built for Carnival Cruise Lines in 1985
Click here to view the article.