Odyssey of the Seas

Royal Caribbean

Odyssey of the Seas Reaches Construction Mile-Stone

By John Shallo

March 03, 2021

Odyssey of the Seas, Royal Caribbean International’s brand-new ship under construction at the Meyer Werft shipyard in Papenburg, Germany, has completed its 10-plus-hour, 20-mile (32-kilometer) conveyance. The conveyance is a process unique to ships built at Meyer Werft, as the shipyard is situated inland along the Ems River, and the ship must make the journey backward and down the river to get to the North Sea.

A sight to behold, maneuvering a 169,000-gross-ton ship that measures 1,138 feet (347 meters) long and 135 feet (41 meters) wide is no mean feat. The milestone naturally draws local residents to the riverbanks to marvel at this impressive technical and operational moment.

Boasting all-new and first-to-brand experiences, Odyssey will raise the bar when it comes to all aspects of the cruise experience. The innovative Quantum Ultra Class ship’s combination of iconic Quantum Class favorites and new-to-class features include:

In a Royal Caribbean first, Odyssey will debut in Haifa, Israel this May. Residents of Israel will be the first to experience the ship on a mix of 3- to 7-night escapes visiting the Greek Isles and Cyprus, roundtrip from Haifa. Odyssey will then cross the Atlantic to begin its inaugural North American season in November, offering 6- to 8-night itineraries from Fort Lauderdale and visiting far-flung destinations, including Curacao and Aruba. 

For additional information or to make reservations, vacationers can call their travel advisor; visit RoyalCaribbean.com; or call (800) ROYAL-CARIBBEAN.

Recommended: